The hole is dug, the concrete has been poured and the base pole has been set. I went over to home depot and purchsed the following:
(1) 80 lbs. bag of quickcrete
(1) 1 5/8" X 8' base pole
(1) 8" X 48" concrete quick tube
(2) 1" X 10' rigid conduit
(2) 1" conduit joining couplings
So far so good. I will wait for the concrete to cure and then cut the base pole down to size and install the conduit poles.